





|
Timeline– 2/16/10 |
|
Lightning Bots Team 2010 |
|
Updated July 15, 2010 |
|
2-16-10 Today, the electrical team helped out Maplewood by displaying how to set up the wires for their robot to operate. The build team measured and cut wood for our robot’s frame. The PR team took photos and painted our cute caricatures on the crate. Towards the end of the day Maplewood gave their robot a little test drive =D. |